×

finished state meaning in Chinese

成品形状

Examples

  1. The activity now has a finished state
    现在动作已经处于完成态了。
  2. Rib - hoisting of the long - span cfst arch bridge is very complex . in order that the finished state of structure meets the design requirement it is necessary to study the method of buckle - cable adjusted and determine reasonable finished state
    大跨度钢管拱桥的拱肋吊装过程是一个复杂的过程,为了保证最终的成桥状态满足设计要求,考虑扣索索长的调整方法,确定出施工各阶段的合理状态是很有必要的。
  3. In this paper through analyzing and summarizing to the research achievement and project practise in ascertaining ideal finished state and rational construction state of analyzing cable - stayed bridge at present , there are not a series of systemic theory and method in actual application
    本文通过对目前斜拉桥结构分析中理想成桥状态和合理施工状态确定方面研究成果和工程实践进行分析和总结,发现在其具体实际应用中缺乏一套系统的理论和方法。
  4. In order to assure that the stress and strain state of structure is secure , the author analyses respectively the objective functions of the reasonable finished state and buckle - cable adjusted phase ; thus , the optimized model based on fga is framed . finally according to the example , the computation datum are compared with the iterative forward analysis method and the optimal control theory . the result shows that this method can be used conveniently and meet the construction and design precision
    为了满足大跨度钢管混凝土拱桥施工的安全性与成桥预期的内力状态和拱肋线形,本文结合工程实例,分别对合理成桥状态和扣索索长调整的目标函数的确定进行了分析,将一组多变量、多约束的最小化问题无约束化,从而建立起适合于该问题的遗传算法优化模型,将其计算结果分别与迭代前进法和随机最优控制理论进行了比较;结果表明,采用该方法编制的基于结构计算的遗传优化程序操作灵活,能很好的满足施工和设计要求。
  5. The optimization model of the cable tensile force is established , resolving the ideal finished state of considering syntheticly the requirement including the dead load , active load and presress of structure , meanwhile , providing a forward - calculating method for determining the rational construction state on the foundation of the optimization model . on the other hand how to determine and adjust the important parameter , the cable midst tensile forces and the main feam form setting levels in constructing cable - stayed bridge , has also been analyzed , besides , the corresponding calculation method is introduced and applied to the actual construction controlling of xian tao han jiang highway bridge well
    本文以仙桃汉江公路大桥为工程背景在斜拉桥设计计算方面进行了的研究,建立了斜拉桥索力优化模型,一方面解决了能综合考虑结构恒载、活载及预应力等多方面因素的理想成桥状态确定问题;另一方面在确定合理施工受力状态问题上提出了一套以索力优化模型为基础的正装计算法。同时对斜拉桥施工中关键参数斜拉索中间索力和主梁立模标高的确定和调整做了进一步的分析,提供了相应的计算方法,并应用于仙桃汉江公路大桥施工控制过程中,取得了良好的效果。

Related Words

  1. absorbent finishing
  2. finished flour
  3. shrug finish
  4. machine finishing
  5. finishing bath
  6. finishing brush
  7. earliest finish
  8. hydrophilic finish
  9. anode finish
  10. finished primer
  11. finished square nut
  12. finished stack
  13. finished steel
  14. finished stock
PC Version

Copyright © 2018 WordTech Co.